DurationAssignment name and brief description of main deliverables or outputsName of Client and Country
of Assignment
Approximate
Contract value
(PKR)
Role on the
Assignment
January 2022-
December
2023
Assignment Name
Feasibility Study, Detail Engineering Design & Preparation
of PC-Is 05 Nos Small Dam in Merged Area (Package –
XII)


Brief Description of Main Deliverables or outputs:

• Preparation of Review report.
• Preparation of inception report.
• Preparation of Draft Feasibility Report.
• Preparation of Final Feasibility Report for individual
project.
• Preparation of Feasibility level PC-I Proforma for
individual project
Detail Design:
• Carry out detailed design of the Project
• Seismic impact in detailed Design of all the
components of the Dam and System
• Submit Final Design Report, specifications, tender
drawings and tender documents
Prepare and submit construction drawings
Name of Client:
Project Director, PSU Small
Dams Merged Areas,
Directorate General Small
Dams, Irrigation Department
Khyber Pakhtunkhwa

Country of Assignment:
Pakistan
59.74 MillionJoint Venture Partner
with Rehman Habib
Consultant (Pvt.) Ltd
Lahore-RHC