Duration | Assignment name and brief description of main deliverables or outputs | Name of Client and Country of Assignment | Approximate Contract value (PKR) | Role on the Assignment |
---|---|---|---|---|
January 2022- December 2023 | Assignment Name Feasibility Study, Detail Engineering Design & Preparation of PC-Is 05 Nos Small Dam in Merged Area (Package – XII) Brief Description of Main Deliverables or outputs: • Preparation of Review report. • Preparation of inception report. • Preparation of Draft Feasibility Report. • Preparation of Final Feasibility Report for individual project. • Preparation of Feasibility level PC-I Proforma for individual project Detail Design: • Carry out detailed design of the Project • Seismic impact in detailed Design of all the components of the Dam and System • Submit Final Design Report, specifications, tender drawings and tender documents Prepare and submit construction drawings | Name of Client: Project Director, PSU Small Dams Merged Areas, Directorate General Small Dams, Irrigation Department Khyber Pakhtunkhwa Country of Assignment: Pakistan | 59.74 Million | Joint Venture Partner with Rehman Habib Consultant (Pvt.) Ltd Lahore-RHC |