DurationAssignment name and brief description of main deliverables or outputsName of Client and Country
of Assignment
Approximate
Contract value
(PKR)
Role on the
Assignment
February
2021-
April 2023
Assignment Name:
Review / Updating and Construction Supervision of Baz Ali Small Dam, District Kurram.


Brief Description of Main Deliverables or outputs:
• Preparation of draft design report, draft construction drawings and draft tender documents
and specification
• Preparation final updated detail design report,
construction drawings, tender documents and
specification documents
• Preparation of regular monthly progress report
• Preparation and submission of as built drawings
• All correspondence, Surveys, lab test results and
construction drawings along with soft copies in
binded form.
• Preparation of Chakbandi and warabandi.
• Preparation of operation and maintence manual
for the project.
• Preparation of PC-IV for the project
• Preparation of Draft revised PC-I Proforma in and
final revised PC-I Proforma in required numbers if
required as directed by the client.
• Preparation and submission of Punch list in deficit
in liability period.
Name of Client:
Project Director, Small Dams,
Merged area Irrigation
Department Khyber
Pakhtunkhwa.

Country of Assignment:
Pakistan
71.76 Million
As Joint Venture Partner
with Rehman Habib
Consultant (Pvt.) Ltd
Lahore-RHC