DurationAssignment name and brief description of main deliverables or outputsName of Client and Country
of Assignment
Approximate
Contract value
(PKR)
Role on the
Assignment
October 2020-
September
2023
Assignment Name:
Increasing Storage Capacity and Improvement in
Command Areas of Tanda Dam, District Kohat


Brief Description of Main Deliverables or outputs:
Geophysical survey, Topographic Survey and
Carry out additional sub-surface geo-technical
investigation.
• Design review of the Project components including
dam embankment, spillway, irrigation conduit,
intake and outlet structures, irrigation network,
intake structure, road etc.
• Preparation of Tender drawings with bidding
documents.
• Physical investigation of dam & reservoir periphery
within 500-meter proximity of reservoir / Dams.
• Sediment Study & modeling for determining
sedimentation rate & life of reservoir. Seismic
criteria for resistance against earthquake on Dams.
• Supervise construction of the project in capacity of
Engineers representative.
• Submission of Revised Construction Drawings in
accordance with actual site conditions
• Prepare and submit draft design review report&
tender drawings.
• Prepare and submit Final Design Review Report/
Final Detailed design review if required,
specifications, tender drawings, identification of
Quarries (source of construction material) and
preparation of tender documents.
• Prepare and submission of construction drawings
Name of Client:
Executive Engineer Kohat
Irrigation Division Khyber
Pakhtunkhwa

Country of Assignment:
Pakistan
97.95 Million
As Joint Venture Partner
with Rehman Habib
Consultant (Pvt.) Ltd
Lahore-RHC